|
Background |
|
Project Name |
Public Parking Lot in the Central City |
|
Summary |
The scale requirements of this project: 10 public parking lots Construction contents: Including ground, underground and tridimensional parking lots etc. |
|
Industry |
Third industry |
Industry |
Transportation infrastructure |
|
Way of cooperation |
BOT for each parking lot separately |
|
Conditions for project construction |
This project mostly uses the existent parking lots or establishes new parking lots by leveling and reconstructing the planned empty land. The construction scale of civil engineering is small. For the water and electricity facilities, the existent neighboring urban water and electricity systems may be adopted. In the central city, the ready-mixed concrete may be directly transported to the field. In addition, the optimal transportation, production and living facilities are available. |
|
Investment |
|
Amount of investment |
About 500 million Yuan |
|
Projection of benefits |
Chengdu is the China Best Tourism City as well as the China Experiment District of Taking All Factors of Urban and Rural Development into Consideration. Recently, the population and amount of vehicles capacity of the central area of Chengdu increase sharply, and the parking lots are hard pressed. The problems of much difficulty to park and parking safety management etc. recently become more prominent. This project may meet the double demands for social and economic development and standardized urban parking management. The prophase investment and investment risk are low and the latter income will be stable. |
|
Introduction to Project Owner (For JV Only) |
|
Name of project owner |
|
|
Profile of project owner |
|
|
Contact |
|
Contact |
Chengdu Investment Promotion Commission |
|
Name |
Li Yan |
Tel |
02886271873 |
|
Email |
|
Fax |
02886271873 |